Before starting building Rosa dei Venti in 2007, we had to increase the energy power provided to the area.
To turn on all the lights, aircondition machines, heating systems, electric hobs and all the pool pumps we needed about 200 kWp.
We realized to cause a big trouble to the enviroment, so in 2011 we have been able to build a solar plant in another building that we own here in Moniga del Garda: this plant delivers 193,60 kWp...once again problem solved!
Check the performance of our plant:
Even if we can obtain energy without producing pollution, we invite our guests to "Think Green", avoid any waste of energy
- * don't turn on the aircondition when you are not in the apartment,
- * if aircondition is on, close all the windows,
- * if outside is 30°C, don't set aircondition temperature at 18°C, 24°C is perfect!
- * don't switch on at the same time aircondition, microwave, electric kattle, all the lights, electric hobs...